0 members (),
279
guests, and
30
robots. |
Key:
Admin,
Global Mod,
Mod
|
S |
M |
T |
W |
T |
F |
S |
|
|
|
|
|
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
10
|
11
|
12
|
13
|
14
|
15
|
16
|
17
|
18
|
19
|
20
|
21
|
22
|
23
|
24
|
25
|
26
|
27
|
28
|
29
|
30
|
|
|
|
|
|
|
There are no members with birthdays on this day. |
#28787
Sun 16 Apr 2006 11:17:AM
|
Joined: Feb 2001
Posts: 381,903
Launch Director
|
OP
Launch Director
Joined: Feb 2001
Posts: 381,903 |
04.12.06<br /><br /><br />Joe Pally<br />Headquarters, Washington<br />(202) 358-7239<br /><br /><br />George H. Diller<br />Kennedy Space Center, Fla.<br />(321) 867-2468<br /><br /><br />STATUS REPORT: ELV-041206<br /><br /><br />EXPENDABLE LAUNCH VEHICLE STATUS REPORT<br /><br /><br />Mission: Cloud-Aerosol Lidar and Infrared Pathfinder Satellite <br />Observation and CloudSat (CALIPSO/CloudSat) <br />Launch Site: NASA's Space Launch Complex 2, Vandenberg Air Force Base, <br />Calif. <br />Launch Vehicle: Boeing Delta II <br />Launch Date: April 21, 2006 <br />Launch Time: 6:02:08 a.m. EDT <br /><br /><br />NASA transported CALIPSO and CloudSat from the Astrotech payload <br />processing facility at Vandenberg Air Force Base, Calif., to the <br />launch complex on April 8. The payload was hoisted and attached to <br />the top of the Delta II rocket.<br /><br /><br />The Flight Program Verification, an integrated electrical and <br />mechanical flight test involving the Delta II and the <br />CALIPSO/CloudSat payload, was successfully completed today. Following <br />the test, technicians began installation of the launch vehicle <br />ordnance. Payload closeouts are planned for Thursday. Installation of <br />the fairing around the two spacecraft is scheduled for Friday. <br /><br /><br />For more information about CALIPSO/CloudSat, visit: <br /><br /><br /> http://www.nasa.gov/calipso or http://www.nasa.gov/cloudsat <br /><br /><br />Previous status reports are available on the Web at:<br /><br /><br /> http://www.nasa.gov/centers/kennedy/launchingrockets/status/2006
David Cottle
UBB Owner & Administrator
|
|
CMS The Best Conveyancing solicitors conveyancing quotes throughout the UK
For any webhosting enquiries please email webmaster@aus-city.com
|
Entire Thread
|
Expendable Launch Vehicle Status Report ELV-041206
|
Webmaster
|
Sun 16 Apr 2006 11:17:AM
|
Forums60
Topics688,392
Posts723,006
Members2,957
|
Most Online3,142 Jan 16th, 2023
|
|
|