George H. Diller
Kennedy Space Center, Fla.
321-867-2468
george.h.diller@nasa.gov
STATUS REPORT: ELV-021910
EXPENDABLE LAUNCH VEHICLE STATUS REPORT
Spacecraft: Geostationary Operational Environmental Satellite (GOES-P)
Launch Vehicle: Delta IV
Launch Pad: Complex 37, Cape Canaveral Air Force Station
Launch Date: March 2, 2010
Launch Window: 6:19 - 7:19 p.m. EST
Due to weather, rollout of the GOES-P satellite from the Astrotech
payload processing facility to Launch Complex 37 was postponed one
day to Feb. 13. The spacecraft was hoisted atop the Delta IV rocket
on Feb. 14. An interface verification test to check the connections
between GOES-P and the Delta IV was conducted on Feb. 18.
The launch has been rescheduled to March 2 to allow sufficient time to
complete scheduled work that was slowed by the weather. The Flight
Readiness Review will be held on Feb. 25.
GOES-P will be launched into orbit for NASA and NOAA by Boeing Launch
Services aboard a United Launch Alliance Delta IV rocket under an FAA
license.
Previous status reports are available at:
http://www.nasa.gov/centers/kennedy/launchingrockets/status/index.html