|
0 members (),
572
guests, and
23
robots. |
Key:
Admin,
Global Mod,
Mod
|
S |
M |
T |
W |
T |
F |
S |
|
|
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
10
|
11
|
12
|
13
|
14
|
15
|
16
|
17
|
18
|
19
|
20
|
21
|
22
|
23
|
24
|
25
|
26
|
27
|
28
|
29
|
30
|
31
|
|
There are no members with birthdays on this day. |
#63212
Thu 07 Jul 2011 09:45:PM
|
Joined: Feb 2001
Posts: 381,903
Launch Director
|
OP
Launch Director
Joined: Feb 2001
Posts: 381,903 |
Space Shuttle Atlantis launch preparations continue on schedule despite inclement weather near the launch pad near midday Thursday. As engineers prepared to move the Rotating Service Structure away from Atlantis, a severe thunderstorm passed overhead, delivering rain and lightning that produced two strikes near the launch pad. Data review showed the two strikes occurred at 12:31 p.m. and 12:40 p.m. EDT. The first struck the water tower 515 feet (157 meters) from the pad and the second struck the beach area northeast of the pad. So far, the data review indicates no issues with any systems, including shuttle Atlantis, External Tank, Solid Rocket Boosters, Space Shuttle Main Engines or Ground Support Equipment. Review of the data will occur again during the traditional “Tanking Weather Meeting” scheduled for 1:30 a.m. Friday, which is the point where managers will decide to proceed with fueling Atlantis’ tank ahead of launch. Fueling is scheduled to start at 2:01 a.m. Friday leading to launch at 11:26 a.m.
Source: %%LINK%%
David Cottle
UBB Owner & Administrator
|
|
CMS The Best Conveyancing solicitors conveyancing quotes throughout the UK
For any webhosting enquiries please email webmaster@aus-city.com
|
Forums60
Topics685,289
Posts719,900
Members2,957
|
Most Online3,142 Jan 16th, 2023
|
|
|
|
Copyright 1996 - 2023 by David Cottle. Designed by David Bate Jr. All Rights Reserved.
By using this forum, the user agrees not to transfer any data or technical information received under the agreement, to any other entity without the express approval of the AUS-CITY Forum Admins and/or authors of individual posts (Forum Admins and DoD/USSPACECOM for the analysis of satellite tracking data).
Two-line elements (TLE) and all other satellite data presented and distributed via this forum and e-mail lists of AUS-CITY are distributed with permission from DoD/USSTRATCOM.
Reprise Hosting
|
|